66 The Plain, Epping
Status
Completed
Project Type
Residential
Welcome to 66 The Plain, a bespoke collection of 3 four bedroom luxury homes in the heart of Epping
Set in a peaceful and well-connected location, 66 The Plain offers an exclusive opportunity to own a thoughtfully designed family home, where classic style meets modern living. These individually crafted four-bedroom homes sit on the edge of Epping’s vibrant town centre, blending the charm of a green, suburban setting with the convenience of excellent local amenities.
Each home has been built with precision and care, featuring spacious layouts, high-quality finishes, and everything you need included as standard. With open-plan living spaces, private gardens, and dedicated parking, these homes are perfect for families, professionals, or anyone looking to enjoy the best of both countryside and city life.
From scenic walks in nearby Epping Forest to shopping and dining in Epping, there’s something for everyone. And with direct access to London via the Central Line, commuting or weekend adventures are always within easy reach.
66 The Plan – is where your new chapter will begin.
Key Details
- Location: Epping
- Number of Floors: 2
- Tenure: Freehold
Media
Description
A COLLECTION OF BEAUTIFULLY CRAFTED FOUR-BEDROOM DETACHED HOMES WHERE LUXURY MEETS SUSTAINABILITY.
Welcome to The Plain; an exclusive new development in the heart of Epping, offering a rare blend of striking architectural design, high-end specification, and considered eco-conscious features. Each detached residence has been thoughtfully designed for modern living, combining luxurious interiors with future-proof efficiency, ideal for the discerning homeowner.
Step inside and discover elegant living spaces where design and detail come together seamlessly. The ground floor features a refined reception room, a versatile home office/study, and a guest WC, all centred around a spectacular open-plan kitchen and dining space, the true heart of the home. This expansive area is finished with bespoke cabinetry, premium integrated appliances, and ambient lighting, all complemented by a separate utility room for effortless day-to-day living.
Underfloor heating runs throughout the ground floor, delivering both style and comfort in equal measure.
Bifold doors extend the living space into the garden, opening onto a beautifully finished stone patio terrace, ideal for al fresco dining and entertaining. The remainder of the private rear garden is laid to lawn, creating a serene outdoor environment for family enjoyment.
Upstairs, four generously proportioned bedrooms provide both privacy and practicality. The principal suite features a luxurious en-suite shower room, while a contemporary family bathroom serves the remaining bedrooms; all finished with high-quality fixtures and materials.
Each home at The Plain is also designed with sustainability in mind. In addition to an electric vehicle charging point, every property comes with integrated solar panels, helping to reduce your carbon footprint and ongoing energy costs; without compromising on style or comfort.
Set within one of Epping’s most desirable residential locations, The Plain offers the best of both worlds: refined, energy-efficient living within easy reach of vibrant amenities, open countryside, and fast commuter links into London.
Area
address
66 The Plain, Epping
Key transport
Underground
Epping Tube Station
Rail
Roydon, Harlow, Waltham Cross
Road
M11 & M25
Airport
Stansted Airport – 10mi
Transport
Epping is ideally situated in the south-west of Essex, offering a desirable balance of countryside tranquillity and urban connectivity. The town lies at the north-eastern tip of the London Underground’s Central Line, making it a highly accessible location for commuters – just 40 minutes from London Liverpool Street.
Bordered by the ancient woodlands of Epping Forest, the town enjoys protected greenbelt surroundings, preserving its rural charm and open spaces. Major road links including the M11 and M25 are just minutes away, providing easy access to London, Cambridge, and Stansted Airport.
This strategic location makes Epping a sought-after destination for those seeking a peaceful, village-like setting without sacrificing the convenience of city living.
Rail/Tube
Stanstead Airport via M25 – 20 mins
Epping – Liverpool Street Station on the Central Line 37 mins